Missouri Revised Statutes

Chapter 256
Geology, Water Resources and Geodetic Survey
Section 256.443

August 28, 2007


Plan, content--approval of plan by director--eligibility of projects to receive contributions, grants or bequests for construction or renovation costs, limitation.

256.443. 1. The plan shall include a description of the project, the need for the project, land use and treatment measures to be implemented to protect the project from erosion, siltation and pollution, procedures for water allocation, criteria to be implemented in the event of drought or emergency, and such other information as the director may require to adequately protect the water resource.

2. The director shall only approve a plan upon a determination that long-term reliable public water supply storage is needed in that area of the state. Implementation of approved plans will be eligible for cost-sharing expenses as approved by the state soil and water districts commission incurred for required land treatment practices to implement soil conservation plans.

3. Water resource projects shall be eligible to receive any gifts, contributions, grants or bequests from federal, state, private or other sources for engineering, construction or renovation costs associated with such projects, except that no proceeds from the sales and use tax levied pursuant to sections 47(a) to 47(c) of article IV of the state constitution shall be used for such purposes.

(L. 1992 S.B. 661 & 620 § 19)


© Copyright

bottom Missouri General Assembly