319.029. Notwithstanding the fact that a project is a preengineered project or a permitted project, or that a design request was previously made, excavators connected therewith shall be required to give notification in accordance with sections 319.025 and 319.026 prior to commencement of excavation.
(L. 2008 H.B. 1779)Effective 1-01-09